Renovation–Day 3

By: Jill Finger

Jan 21 2016

Category: Uncategorized

2 Comments

Aperture:f/2.2
Focal Length:4.15mm
ISO:125
Shutter:1/0 sec
Camera:iPhone 6s Plus

We accomplished a lot yesterday.  The final coat of spackle was sanded and the crown molding was put back up where it had been taken down.  Wes is holding the board while Jonathan nails it. crown moldingWhile Jonathan nailed, I shop vacced, and shop vacced.  There was (is) sheet rock dust everywhere.008a (3)Here primer is being applied to the crown molding. Jonathan’s a much faster painter than I am, so he does more, but I did some. And then, I caulked the nail holes,tiled and groutedwhile Jonathan grouted the tile.  It turned out beautiful and Wes and I are both very happy.
Today, we wield paintbrushes.

2 comments on “Renovation–Day 3”

  1. This is so exciting!

    Like

  2. Lots of progress!

    Like


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: